Pandogo Cat Collar Chest Leash with Long Lead Strap Size S

Almost sold out!
TY Plus icon Trendyol Plus Exclusive
At checkout 33.32 SAR
34.75 SAR
Size: M

Free shipping & Delivery

Trendyol's commitments

Shopping security

commitments-content-item

Secure payment

commitments-content-item

Privacy protection

Safe delivery

commitments-content-item

Refund for lost and damaged packages

commitments-content-item

Coupon for late delivery

Free returns

Easy and free return in 15 days.

Highlighted features:

Pandogo Cat Collar Chest Leash with Long Lead Strap Size S features

Color
Red
Instructions for Use/Warnings
Wet wipes can be used. If washed in the machine, metal accessories may rust over time.
Origin
TR

Product details

Pandogo Cat Collar Chest Leash with Long Lead Strap Size S features

Color
Red
Instructions for Use/Warnings
Wet wipes can be used. If washed in the machine, metal accessories may rust over time.
Origin
TR

Safety information

Product safety information